Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 5(04), 339–49.

Green, S D (1998) The technocratic totalitarianism of construction process improvement: a critical perspective. Engineering, Construction and Architectural Management, 5(04), 376–86.

Lam, K C, Runeson, G, Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(04), 359–75.

Loosemore, M (1998) Social network analysis: using a quantitative tool within an interpretative context to explore the management of construction crises. Engineering, Construction and Architectural Management, 5(04), 315–26.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(04), 350–8.

Smith, J M, Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: an exploratory study. Engineering, Construction and Architectural Management, 5(04), 387–98.

Tah, J H M, V, C and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(04), 327–38.

Zhang, W R, Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(04), 399–410.